Atlas Arena, Łódź, Poland
04.06.2023 – 05.06.2023
My tasks at Metal Hammer Festival 2023 consisted of full configuration of main LED screen as well as two smaller wing LED screens, arrangement of content given to me by bands during rehearsals and routing video signal from cameras and from Pantera video crew.
During the show I live-operated multimedia software and video processing hardware according to artists requirements and situation on the stage.
Main multimedia equipment:
Analog Way Aquilon
PC with Resolume Arena software
NovaStar LED processors
This job was quite different compared to what my work usually consist of. My duty was to ensure high...
My job at this corporate event was to configure multiple LED screens arrangement and operate...
At this corporate event for Samsung my task before the show was to setup configuration for 5 LED...